A 106 GrB/ASTM A 335 P5/P9/P91/SA210C Seamless Boiler Steel PIPE

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2017-08-31 06:52
Browse the number: 194
inquiry
Company Profile
 
 
Product details
A 106 GrB/ASTM A 335 P5/P9/P91/SA210C seamless boiler steel pipe

Quick detail

1.Standard:BS,GB,ASTM,DIN,EN

2.OD:6-1250mm

3.Thickness:2-50 mm 

4.Length:3-13meters or as requirements

Description

20G is the steel material of GB 5310- 2008. GB 5310- 2008 standard is applicable to seamless tubes for making steam boiler whose pressure is high or higher and seamless tubes used as pipelines. Use: Mainly used in power stations and nuclear power plant boiler high temperature, high pressure transmission fluid collection tank and piping.



A 106 GrB/ASTM A 335 P5/P9/P91/SA210C seamless boiler steel pipe Specification

Product Name:

20G high pressure steel pipe

Size:

OD:

14mm-420mm

Thickness:

2~40mm

Length:

4000mm-12000mm

Steel material

A106 GrB/20G/A53 GrB

Standard:

BS, GB, ASME, ASTM

Usage:

used for gas, oil, water pipes and construction

Ends:

plain ends or threaded with socket and plastic caps or beveled ends

Surface:

bared or black painted, galvanized or with oiled or client option

Package :

bags, bundles, losses or client option

Inspection :

with hydraulic testing, eddy current , Infrared test

Technique

Hot Rolled/ Cold Drawn/Cold Rolled

Length

6m/9m/12m or other size

Type

Seamless

Min. Order Quantity

1Ton

Date of Delivery

According to the contract

Payment:

T/T, L/C at sight, etc.

Port of Shipment

Xingang,China

Others:

We also supply steel plate and steel profile

Steel pipe production process


A 106 GrB/ASTM A 335 P5/P9/P91/SA210C seamless boiler steel pipe Application

Boiler tubes,Boiler pipes,Boiler parts For pressure liquid transport, widely used for oil,gas,water and other liquid transportation, oilfield engineering, ductwork, construction,steel pile and oil&gas project which use pipe

Loading and shipping





Customer visit


Competitive advantage

1.One-stop purchasing saving time and cost for customer

2.Learning our company in comprehensive and multiple channels

3.Inspection at any time

4.Giving customer feedback of production schedule 

5.Delivering in time,tracking shipment,giving feedback to customer on regular basis

6.Solving quality issue immediately



Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]